Field engineer for Castoro II DLB of SAIPEM fleet:

  • WASIT - installation of 10" MEG lines in ARBI gas field

The project includes the installation of approximately 70km of 10" rigid MEG line between the injection platform IIP and the production platform ARBI. The following activities were monitored during the operational phases of the installation of the line:

  • Start up of the MEG line with calculation of the cut to length of the initiation cable and connection to the pipe column
  • Normal lay monitoring the weather, pipe and consumable requisition
  • Operations of crossing with other rigid lines or umbilical
  • Lay down with final calculation to measure the cut to length to reach the target box of the project

CLIENT: SAUDI ARAMCO

  • WASIT - installation of 10" MEG lines 10" in HSBH gas field

The project includes the installation of approximately 70km of 10" rigid MEG line between the injection platform IIP and the production platform HSBH. The following activities were monitored during the operational phases of the installation of the line:

  • Start up of the MEG line with calculation of cut to length of the initiation cable and connection to the pipe column
  • Normal lay monitoring the weather, pipe and consumable requisition
  • Operations of intersection with other rigid lines or umbilical
  • Lay down with the final calculation to measure the cut to length to reach the target box of the project 

CLIENT: SAUDI ARAMCO