Field engineer for the Castoro II DLB means multi-purpose fleet of Saipem, platform installation and spool:

  • LTA PROJECT - SPOOL INSTALLATION

The project includes the installation of a production spool and a tie-in spool.

The following activities were performed and supervised during the installation phase:

  • Preparation to install the spool
  • Calculation the length of the spool
  • Spool prefabrication on board
  • Installation and connection of the spool between the existing line and the riser by divers

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLATION OF PLATFORM ZULF 480-489

The project includes the installation of a drilling platform on an existing jacket. The following activities were monitored and supervised during installation on board:

  • Preparation activities for the installation of the platform, e.g. removal of the parts on the jacket for the installation of the platform
  • Supervise installation tasks as lifting, positioning and welding of the legs of the platform with the jacket
  • Completion works on the jacket, e.g. removal of the pad-eye for the platform lifting, installation of stairs leading to the platform, welding of plates and beams to connect the platform with the existing drill deck. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLATION OF PLATFORM ZULF 490-499

 

The project includes the installation of a drilling platform on an existing jacket. The following activities were monitored and supervised during installation on board:

 

  • Preparation activities for the installation of the platform, e.g. removal of the parts on the jacket for the installation of the platform
  • Supervise installation tasks as lifting, positioning and welding of the legs of the platform with the jacket
  • Completion works on the jacket, e.g. removal of the pad-eye for the platform lifting, installation of stairs leading to the platform, welding of plates and beams to connect the platform with the existing drill deck.

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET MRJN 420 \ 429

The project includes the installation of a jacket with 4 legs and 3 bays in Marjan field of Persian Gulf. The following activities were performed and supervised during the installation:

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting, upending and positioning of the platform at the final position
  • Jecket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of conductors piles according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET SFNY 1000 \ 1009

The project includes the installation of a jacket with 4 legs and 1 bay in SFNY field of Persian Gulf. The following activities were performed and supervised during the installation:

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting, upending and positioning of the platform at the final position
  • Jacket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of conductors piles according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET ARBI 4

The project includes the installation of a jacket with 4 legs and 3 bays, single slope in ARBI field of Persian Gulf. The following activities were performed and supervised during the installation:

 

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting and positioning of the platform at the final position
  • Jacket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of a 32" conductor pile according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET ARBI 5

The project includes the installation of a jacket with 4 legs and 3 bays, single slope in ARBI field of Persian Gulf. The following activities were performed and supervised during the installation:

 

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting and positioning of the platform at the final position
  • Jacket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of a 32" conductor pile according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET HSBH 22

The project includes the installation of a jacket with 4 legs and 3 bays, single slope in HSBH field of Persian Gulf. The following activities were carried out and supervised during the installation:

 

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting and positioning of the platform at the final position
  • Jacket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of a 32" conductor pile according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET HSBH 24

The project includes the installation of a jacket with 4 legs and 3 bays, single slope in HSBH field of Persian Gulf. The following activities were performed and supervised during the installation:

 

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting and positioning of the platform at the final position
  • Jacket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of a 32" conductor pile according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO

  • LTA PROJECT - INSTALLING THE JACKET HSBH 19

The project includes the installation of a jacket with 4 legs and 3 bays, single slope in HSBH field of Persian Gulf. The following activities were performed and supervised during the installation:

 

  • Preparation activities for jacket installation and survey of the installation area
  • Lifting and positioning of the platform at the final position
  • Jacket levelling
  • Foundation piles installation: positioning, stabbing, hammering, add-on stabbing, welding and hammering until the target box. Installation of the piles according to the sequence
  • Cutting portion of the piles for installation of transition pieces
  • Installation of a 32" conductor pile according to the procedure
  • Installing TDD, boatlanding and transition piece
  • Completion work with installation of walkways, stairs, gratings, handrails etc. 

CLIENT: SAUDI ARAMCO