Joint to SAIPEM GROUP – 09/2006 - 11/2014
Operation Engineer for Shah Deniz 2 23/07/2014 – 08/11/2014
- Preparation of pipelay barge PLBH for pipeline installation in Caspian sea
- Follow up the pipeline installation on board the pipelay barge PLBH
CLIENT: BP
Project engineer for WDDM Phase IXa 22/11/2013 – 22/07/2014
- Preparation for vessel necessary for the field development in North West offshore of Alexandria in Egypt
- Vessel Preparation for power cable post trenching activities
- Pipelay vessel preparation for rigid pipeline installation
- Follow up of material mobilization for pipelay vessel Castorone preparation
- Follow up pipeline installation activities
- Follow up of de-mobilization material after the end of the project
CLIENT: BURULLUS
Field engineer for pipelay vessel Castorone 17/01/2013 – 21/11/2013
- Production start up - Navigation between Walvis Bay and Galveston
- Deep water sea trials in Gulf of Mexico
- JSM - 20" SCR Installation, and 24" trunkline for oil distribution at 2200m water depth with installation of subsea structures and valves of about 70 ton in Gulf of Mexico
CLIENT: CHEVRON
Field engineer for derrick lay barge Castoro II 21/05/2012 – 16/01/2013
- Wasit - Follow up 10" MEG line installation in shallow water of Persian Gulf
CLIENT: SAUDI ARAMCO
Field engineer for pipe lay barge Castoro SEI 15/10/2011 – 21/05/2012
- Nord Stream - Follow up of 48" trunkline installation in Baltic sea at maximum 200m water depth between Russia and Germany
CLIENT: NORD STREAM PROJECT
Field engineer for derrick lay barge Castoro II 07/09/2010 – 14/10/2011
- LTA - Follow up Jacket and top side installation of 800 ton maximum load in Persian Gulf at maximum 60m water depth in Saudi Arabia
CLIENT: SAUDI ARAMCO
Pipeline Engineer 06/09/2006 – 06/09/2010
- WALKER RIDGE PROJECT- INSTALLATION ENGINEERING FOR BID
CLIENT: CHEVRON - new pipelay vessel CASTORONE – design for for construction
CLIENT: SAIPEM - NORD STREAM PROJECT – installation engineering for a 48" pipeline in baltic sea
CLIENT: NORD STREAM PROJECT - SOUTH STREAM PROJECT – mechanical design for the wall thickness of pipeline along the route
CLIENT: ENI GAS&POWER - GORGON PROJECT - INSTALLATION ENGINEERING FOR BID OF 32" TRUNKLINE IN WESTERN AUSTRALIA
CLIENT: CHEVRON - BROWSE PROJECT - INSTALLATION of IN-Line structure IN WESTERN AUSTRALIA
CLIENT: WOODSIDE - SHTOKMAN PROJECT- INSTALLATION ENGINEERING FOR BID OF A 42" TRUNKLINE IN RUSSIA
CLIENT: GAZPROM - AB 15 GAS GATHERING BID – INSTALLATION ENGINEERING FOR A NEW RIGID RISER IN WEST AFRICA
CLIENT: EXXON MOBIL
Structural analyst and project specialist of chassis and bodywork in carbon fiber for automotive of Atr group
Joint to Atr Engineering s.r.l. Colonnella (TE) – 10/2005 - 04/2006
Project Specialist for:
- CHASSIS CONSTRUCTION FOR LE MANS - DESIGN AND STRESS ANALYSIS
CLIENTE: PEGEAUT - STRUCTURAL INTERNAL VERIFICATION – DESIGN AND STRESS ANALYSIS
CLIENTE: ATR CARS AND ATR COMPOSITE
Progettista e disegnatore of automatic machine for DEF engineering
Joint to DEF Engineering s.r.l. Chieti Scalo (CH) – 07/2005-10/2010 and 05/2006-07/2006
Project Specialist for:
- LIFTING MACHINE FOR PERSONS – DESIGN AND DRAWINGS
CLIENT: FARAONE - MILLING MACHINE – DESIGN AND DRAWINGS
CLIENT: TECNOMATIC - NEW PLANT FOR GLASS CUTTING – DESIGN REVIEW
CLIENT: PILKINGTON